20 OCTGSTR-3B · Summary return · Sep 2026in 4 days 21 OCTTax Audit Report · Form 3CA/3CB · AY 2026-27 · extended from 30 Sepin 5 days 30 OCTAOC-4 · Financial statements · FY 2025-26in 14 days 7 NOVTDS / TCS deposit · Deducted in Oct 2026in 22 days 11 NOVGSTR-1 · Outward supplies · Oct 2026in 26 days 15 NOVPF & ESI · Contributions · Oct 2026in 30 days 21 NOVITR filing · Audit cases · AY 2026-27 · extended from 31 Octin 36 days 29 NOVMGT-7 / 7A · Annual return · FY 2025-26in 44 days
All due dates

Batch costing and economic batch quantity: how to cost a production run and decide its size, with a worked example for a component maker

Batch cost = direct material + direct labour + direct expenses + set-up cost + overhead absorbed for that batch; batch cost per unit = batch cost ÷ units in the batch. The...

Published
Updated
Reading time
6 min
Views
24
Questions
6 answered
  • Expert Reviewed
  • Medium Complexity
Topic
Accounting Standards & Bookkeeping
Published
October 4, 2026
Last updated
Oct 4, 2026
Reading time
6 min
0:00
Last updated: October 2026Verified against: Government sources

When a shop makes identical parts in lots rather than singly, two questions follow: what did this lot cost per piece, and how big should each lot be? Batch costing answers the first; the economic batch quantity answers the second. Both suit component makers, bakeries, garment units and anyone who makes in runs.

Unit costing and batch costing

Unit (single or output) costing suits one uniform product made continuously: cost per unit = total cost ÷ units. Batch costing suits products made in lots: each lot is a cost unit, with its own batch card collecting material issues, labour tickets and overhead; all units in a lot are treated as identical. Difference from job costing: a job is a single customer's order with its own specification; a batch is a lot of identical items, often made for stock. The job costing guide covers the order-based method.

Data needed

For each batch: material issued, labour hours and rate, direct expenses, the set-up (changeover) cost and the overhead rate. For the size decision: annual demand, set-up cost per batch, and the cost of holding one unit for a year (interest on money tied up, storage, insurance, loss). Tie your rates to the overhead absorption rate already used in the cost sheet. A costing and pricing analysis can set up the batch card for you.

The method

  1. Open a batch card with a batch number.
  2. Charge direct material and labour issued to the batch.
  3. Add set-up cost (changeover labour, scrap in trial runs, tooling).
  4. Absorb overhead at the predetermined rate.
  5. On completion, divide by good units to get cost per unit.
  6. For sizing, compute EBQ and compare total cost at neighbouring sizes.

EBQ resembles the economic order quantity, with set-up cost per run in place of cost per order. The simple formula treats a batch as arriving at once; where production is gradual the effective holding cost is lower and the EBQ somewhat higher.

Worked example: a maker of auto components

A shop makes a bracket. All figures assumed. Annual demand 20,000 units; set-up cost ₹2,500 per batch; holding cost ₹4 per unit per year. Direct material ₹30 a unit; direct labour ₹12 a unit; overhead absorbed ₹8 a unit.

EBQ = √(2 × 20,000 × 2,500 ÷ 4) = √(100,000,000 ÷ 4) = √25,000,000 = 5,000 units. Batches per year = 20,000 ÷ 5,000 = 4.

Cost of three batch sizes

2,500 units5,000 units10,000 units
Direct material (30 a unit)75,000150,000300,000
Direct labour (12 a unit)30,00060,000120,000
Set-up cost2,5002,5002,500
Overhead absorbed (8 a unit)20,00040,00080,000
Batch cost127,500252,500502,500
Cost per unit51.0050.5050.25

Check: 75,000 + 30,000 + 2,500 + 20,000 = 127,500; 150,000 + 60,000 + 2,500 + 40,000 = 252,500; 300,000 + 120,000 + 2,500 + 80,000 = 502,500. Per unit: 127,500 ÷ 2,500 = 51.00; 252,500 ÷ 5,000 = 50.50; 502,500 ÷ 10,000 = 50.25.

The cost per unit keeps falling as the batch grows, because the ₹2,500 set-up is spread over more pieces. Taken alone, that suggests making the largest batch. The holding cost reverses it.

Yearly cost of the decision

Batch sizeBatches a yearSet-up cost a yearAverage stockHolding cost a yearTotal (₹)
2,500820,0001,2505,00025,000
5,000 (EBQ)410,0002,50010,00020,000
10,00025,0005,00020,00025,000

At EBQ both costs are 10,000 and the total, 20,000, is lowest. Expressed per unit made (dividing the year's holding cost by 20,000 units): ₹0.25, ₹0.50 and ₹1.00. Adding that to the batch cost per unit gives 51.25, 51.00 and 51.25, so the 5,000 batch is the cheapest all-in at ₹51.00 a unit.

What the owner decides. Run the bracket in batches of 5,000, four times a year. If the owner can halve the set-up cost to ₹1,250 (quick-change fixtures), EBQ falls to √(2 × 20,000 × 1,250 ÷ 4) = √12,500,000, about 3,536 units, and smaller runs become sensible. That is the practical reason to invest in faster changeovers.

How to read the result

Do not take the EBQ as exact; the total-cost curve is flat near the bottom, so 4,500 or 5,500 units cost little more. Adjust for machine availability, material pack sizes and customer lots. Remember the formula assumes steady demand; seasonal products need a plan by season.

Common mistakes

  • Spreading set-up cost on the number of units without checking holding cost.
  • Treating batch cost per unit as final when some units fail inspection; divide by good units.
  • Mixing batches of different specifications under one card.
  • Using the purchase price of a bought-in part as the holding cost instead of the cost to hold one unit.
  • Ignoring machine time lost in set-up when the machine is the bottleneck.

Batch cost cards also feed the cost sheet for pricing.

Need help with costing your production runs?

If batch sizes are set by habit or by the largest order, we can build a batch card and a run-size review from your own set-up and holding costs through a costing and pricing analysis.

Key takeaways

  • Batch cost per unit = batch cost ÷ good units; the set-up cost is shared across the lot.
  • EBQ = √(2DS ÷ H); at that size set-up and holding costs are equal and total cost is lowest.
  • Cost per unit falls with batch size, but holding cost rises; judge by the total.
  • Cutting set-up time shrinks the economic batch.
  • Batch costing differs from job costing: identical items against a customer-specific order.

Read next

Disclaimer: The methods described are standard cost accounting and financial management techniques. The worked example uses an invented business and invented figures, including any tax, interest or exchange rate, which are assumptions for illustration and not current rates. Where the article refers to a legal requirement, the linked guide and the official text should be checked. This article is general information, not legal advice; check the official text before acting.

Quick recapKey facts & short answers

Key Facts About Batch costing

  • Applies in: All states across India, under the relevant central law.
  • Mode: Mostly online via the official government portal.
  • Typical timeline: Ranges from a few days to a few weeks depending on the case.
  • Non-compliance: May attract penalties, interest or late fees.
  • Expert help: TaxClue completes the entire process end to end for you.

What is the difference between batch costing and job costing?

Job costing collects cost for a single, customer-specific order. Batch costing collects cost for a lot of identical items and divides it by the units in the lot.

What does EBQ assume?

Steady demand, a known set-up cost per batch and a known holding cost per unit; batches are treated as produced at once.

An entry without a voucher is a question waiting for an auditor.

— TaxClue Accounts & Audit Desk

Batch costing: a key compliance topic in Indian tax and corporate law that businesses and individuals must understand to remain compliant.

Related Services & Guides

Was this article helpful?
About the author
13,350 articles
Vikas Sharma Verified expert Tax & Compliance Expert

Experienced in company registration, GST, trademark, and compliance. Helping Indian businesses stay compliant.

Last reviewed: Live

Disclaimer: This article is for general informational purposes only and does not constitute professional tax, legal or financial advice. Laws, rates and due dates change and can vary by individual case — always verify with the relevant government source (e.g. mca.gov.in, incometax.gov.in) or consult a qualified professional before acting. TaxClue accepts no liability for decisions taken based on this content.

People also ask

Questions, answered

Short, direct answers to the 6 questions readers ask most on this topic.

Job costing collects cost for a single, customer-specific order. Batch costing collects cost for a lot of identical items and divides it by the units in the lot.

Steady demand, a known set-up cost per batch and a known holding cost per unit; batches are treated as produced at once.

Not unless material cost per unit changes with batch size. It balances set-up cost against holding cost.

Add changeover labour, machine time lost, trial-run scrap and tooling cost for one change, using your own rates.

Plan batches season by season, or compute EBQ on the season's demand.

No. Normal spoilage is absorbed in the cost per good unit; abnormal spoilage should be shown separately and written off.